TribLIVE

| Home

 
Larger text Larger text Smaller text Smaller text | Order Photo Reprints

Penn-Trafford School District to borrow $9.5M for high school renovations

Email Newsletters

Click here to sign up for one of our email newsletters.

Daily Photo Galleries

Tuesday, Nov. 13, 2012, 12:01 a.m.
 

Penn-Trafford school directors on Monday approved borrowing $9.5 million for renovations at the high school.

It's the first step in what Superintendent Thomas Butler described as a $30 million project at the school.

The district is beginning the design process and additional borrowing could be necessary in the coming years, he said.

Butler hopes to present a plan to the public during the summer and have a final design ready in the fall of 2013.

The high school's aging infrastructure — including piping and wiring — is in need of replacement.

The building was constructed in 1972 and renovated in 1996.

“We have to take care of the nuts and bolts of this building,” Butler said.

In addition, he envisions a cutting-edge building with flexible spaces for multiple uses. Beefing up science labs will be one of Butler's “must-haves.”

The board did not discuss the measure before voting unanimously.

“The board feels strongly that this building needs to be addressed,” Butler said earlier in the meeting.

No specific plans are in place for renovations at the high school or any other district building.

Renatta Signorini is a staff writer for Trib Total Media. She can be reached at 724-837-5374 or rsignorini@tribweb.com.

Subscribe today! Click here for our subscription offers.

 

 

 


Show commenting policy

Most-Read Stories

  1. Steelers defensive end Tuitt shifts into high gear
  2. Steelers’ Mitchell taking cautious approach about dealing with injuries
  3. Rossi: Pirates foolish to bet on Burnett return
  4. Strip District, Shadyside startups headed to White House
  5. Doctors to be given star ratings on UPMC site
  6. Big-game hunting means navigating Third World country political systems
  7. WVU to intensify workload amid shorter training camp
  8. Technology helps VA Pittsburgh expand ability to serve veterans
  9. Inside the Steelers: Wide array of receiving options shine
  10. Obama’s Clean Power plan doesn’t change much; opponents remain firm
  11. Members of North Huntingdon family attacked by rabid otter in Va.