1 injured after semi overturns on 62nd Street Bridge | TribLIVE.com
TribLive Logo
| Back | Text Size:
https://triblive.com/local/62nd-street-bridge-shut-down-after-semi-overturns-1-injured/

1 injured after semi overturns on 62nd Street Bridge

Haley Daugherty
| Wednesday, September 3, 2025 6:31 a.m.
WTAE
A semi-truck rolled over on the 62nd Street Bridge in Sharpsburg early Wednesday morning.

A tractor-trailer overturned Wednesday morning on the 62nd Street Bridge, forcing a shutdown of the bridge for about five hours during the morning rush hour.

At about 8 a.m., one lane on the span connecting Pittsburgh’s Stanton Heights neighborhood and Sharpsburg was reopened to traffic. The bridge was fully reopened to both lanes shortly before 9 a.m.

The crash occurred around 2:45 a.m., and police, fire and EMS personnel were called to the scene, according to Allegheny County 911.

One person was transported to a hospital from the scene, dispatchers said. There was no word on the injuries.


Copyright ©2025— Trib Total Media, LLC (TribLIVE.com)