Fox Chapel

Brownshill Road in O’Hara to close April 1 through mid-August

Tawnya Panizzi
By Tawnya Panizzi
1 Min Read March 19, 2019 | 7 years Ago
Go Ad-Free today

Brownshill Road in O’Hara will close on April 1 for just shy of five months.

Crews will replace the structurally deficient Brownshill Road Bridge, erecting a span wide enough for two vehicles and expanding the hydraulic opening for East Little Pine Creek.

Cost is $1.1 million.

The road will be shut down from Dorseyville Road to Saxonburg Boulevard to everyone except local traffic, township officials said.

It will close for about 130 days, depending largely on the weather.

Work also includes water line relocation and the realignment of the Brownshill Road and Saxonburg Boulevard intersection.

Council has discussed the bridge rebuilding for several years, saying it had become an ongoing maintenance issue.

The 33.7-foot steel and concrete span, which sits off Saxonburg Boulevard, will be rebuilt with pre-stressed concrete beams.

Township Engineer Chuck Steinert said it will have increased load capacity and will be safer. The bridge will have two 11-foot lanes and 5-foot shoulders.

Share

Tags:

About the Writers

Tawnya Panizzi is a TribLive reporter. She joined the Trib in 1997. She can be reached at tpanizzi@triblive.com.

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Content you may have missed

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options