Drilling operations on Red Mud Hollow Road (Route 4043) in Ohio Township have begun.
According to a PennDOT news release, work will occur from 8 a.m. to 4 p.m. weekdays through June 22 at two locations between Mt. Nebo Road and Brighton Drive.
Single-lane alternating traffic will be controlled by flaggers. Armstrong Drilling Inc., will conduct the work.
Copyright ©2025— Trib Total Media, LLC (TribLIVE.com)