Slide repair work to close part of Saxonburg Boulevard in West Deer starting Monday
A portion of Saxonburg Boulevard in West Deer will be closed starting Monday as crews begin to fix road slides.
The work requires the road, between Trump Road and Saxony Road, to close completely. The road will be closed to traffic starting at 7 a.m. Monday, and will reopen Friday, Sept. 22, according to PennDOT.
Motorists south of the closure will take Russellton-Dorseyville Road, and turn left onto East Union Road. They will follow East Union Road to Saxonburg Boulevard.
Motorists north of the closure will take the same detour in the opposite direction.
During the closure, PennDOT crews will complete slide repair work and roadway reconstruction.
Kellen Stepler is a TribLive reporter covering the Allegheny Valley and Burrell school districts and surrounding areas. He joined the Trib in April 2023. He can be reached at kstepler@triblive.com.
Remove the ads from your TribLIVE reading experience but still support the journalists who create the content with TribLIVE Ad-Free.