World

London’s Tower Bridge stuck open due to a technical fault

Associated Press
By Associated Press
1 Min Read Aug. 9, 2021 | 4 years Ago
Go Ad-Free today

London’s Tower Bridge was stuck with its roadway arms raised Monday afternoon, snarling traffic on both sides of the River Thames.

Images of the 127-year-old drawbridge, one of several spans that connect the northern and southern parts of the British capital, show the two halves of the roadway pointing skyward with vehicles backed up on either side. The bridge remained stuck at 6 p.m., more than three hours after the problems began.

“Due to a technical issue, Tower Bridge is currently stuck in a raised position,” the City of London Corp., which owns the bridge, said in a statement. “We are working to resolve the issue as quickly as possible.”

The bridge opens about 800 times a year to allow large ships to pass, with the times arranged at least 24 hours in advance.

Tower Bridge was repaired in 2006 after the mechanism became stuck four times the previous year. Malfunctions have been less frequent since then, with the last incident reported on Aug. 22, 2020, when it was stuck for more than an hour.

In May of 1997, U.S. President Bill Clinton was separated from Prime Minister Tony Blair when the bridge opened before his motorcade could cross. In that case there was no technical fault. Just bad timing.

Share

Categories:

Tags:

About the Writers

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Content you may have missed

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options